Facebook SDK

Aba Power Limited a reputable and indigenous distribution licensee and the lessee for the Aba ring- fenced distribution zone in Abia State, Nigeria seeks highly organised and self-motivated professionals for the positions of Sub-Transmission Linesmen in its subsidiary company, APL Electric (APLE), APLE will operate and maintain the electricity distribution ring-fence in Aba upon commissioning of the Aba Integrated Power project Aba IPP. There four vacancies are available for this position. The positions are based in Abia.

Ref Code: STL/003

Responsibilities
Sub-transmission lineman will implement line operations as directed by the SCADA team Supervisor or SCADA Operators. This may include but will not be limited to opening/closing sectionalizing equipment; clearing line faults; performing preventative and corrective maintenance; troubleshooting line faults as needed.

Qualifications
  • Completion of Lineman training and apprenticeship program.
  • Candidate must have minimum of 5 years of experience in distribution and/or transmission line construction, repair, operations and/or commercial service with an electric distribution utility.
The application will close on 7th June, 2013.

How to apply?
Interested and qualified candidates should click here to apply online.

Post a Comment

Previous Post Next Post